Quantcast
Channel: RFPMart - Indiana RFPs
Viewing all articles
Browse latest Browse all 2237

US-FED-00000229072 - Design/Bid/Build of the Logistics Readiness Complex at Grissom ARB, Indiana - Deadline August 7,2024

$
0
0
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue an Invitation for Bids (IFB), Solicitation No. W912QR24B0014 for fully designed construction of a new Logistics Readiness Complex located at Grissom Air Reserve Base (GARB), IN.Provide all labor, material, and equipment necessary to safely construct the Logistics Readiness Complex at Grissom Air Reserve Base on time and within budget. Scope of project calls for the construction of a new for the LRS and all LRS operational and administrative components at Grissom Air Reserve Base. The complex shall include drive through corridor, HVAC controlled mobility bag storage space, offices, meeting rooms, office support spaces, parking, driveways, utility connections, and landscaping with vehicular access to the flight line. The total square footage of the one–story proposed structure is approximately 33,000 SF. The project also includes paved work areas

Viewing all articles
Browse latest Browse all 2237

Trending Articles