This requirement is to repair/replace both the roofing and guttering on the Installation Fitness Center.This will include demolishing the current built up roofing and insulation, protecting the existing metal roofs from damage, removing abandoned electric penetration, hauling all materials off–site, and repairing/replacing both the roofing and guttering on the Installation Fitness Center.Please review all details and information on the attached drawing/statement of work. The information includes all relevant information regarding the scope, CLINS, and installation/facility location.Range of Magnitude: between $250,000 and $500,000SITE VISIT INFORMATION: A site visit has been scheduled for 21 MAY 2024 @ 10:00 am. If interested in attending this site visit, please complete the Base Applicant Release Form which is required to visit the installation NO LATER THAN 20 MAY 2024 @
↧