Install Mental Health Safety Improvements Project # 583–24–201, rev. 1–8–2024 The US Dept of Veterans Affairs and Richard L. Roudebush VA Medical Center (RLR VAMC) are contemplating a contract for construction services to update the Inpatient Mental Health (IPMH) Unit. The project is expected to entail updating room finishes and installing new ligature–resistant fixtures in various spaces. Updates include new flooring, new wall protection, new handrail/wall guards, paint/patch walls, new acoustical ceiling tiles, and new ligature–resistant sinks, toilets, and shower panels, among other work items. Completion of this project will bring the IPMH Unit into compliance with the Mental Health Environment of Care Checklist (MHEOCC), as well as providing necessary updates to the unit s finishes. All work will be performed within the IPMH Unit (Bldg 1, 5th Floor) of the RLR VAMC, located at 1481 West 10th Street, Indianapolis, IN 46202. Period o
↧