The Contractor shall furnish and install a 15–ton packaged air conditioning system to provide necessary cooling to the approximately 2300 sq. ft. room A–B140 Electrical Switchgear room on the basement floor as detailed in the Technical Requirements section, project documents, and VHA Master Construction Specifications. Installation shall include all required work items including but not limited to existing exhaust fan removal, concrete pad pouring, air conditioning unit installation, electrical installation, supply and return duct installation, and BMS integration/configuration. Completion of this project will provide necessary space cooling to critical high voltage electrical components that require room conditioning for proper function.
↧